Preparing of the session
Preparation of a dialysis session with the Physidia monitor
Switching on S3 monitor
Preparation and setting up dialysate bags
Setting up saline bag
Installation of the dialyser
Setting up dialysate cassette
Installation of the blood line and priming
Starting priming process
Connection of an isolation transformer